登录  
 加关注
   显示下一条  |  关闭
温馨提示!由于新浪微博认证机制调整,您的新浪微博帐号绑定已过期,请重新绑定!立即重新绑定新浪微博》  |  关闭

snoopy0755的个人主页

狂热喜欢狗狗及钩针

 
 
 

日志

 
 

Snowtracks Cap  

2010-12-05 15:52:40|  分类: Love@棒针 |  标签: |举报 |字号 订阅

  下载LOFTER 我的照片书  |
PoorBest 
Snowtracks Cap - snoopy0755 - snoopy0755的个人主页

 


Designed by Timothy Peters
 
Directions are for size Small; changes for sizes Medium/Large are in parentheses.
 
To Fit Head Circumference: 22" (24").
Size Small fits as a skullcap. Size Medium/Large fits as a beanie with upturned brim.
 
STITCH NATION by Debbie Stoller? “Bamboo Ewe?”:1 ball 5410 Mercury.
 
Circular Knitting Needles: 3.75 [US 5] and 4.5mm [US 7] 16" long.
Double Pointed Needles: 1 set 4.5mm [US 7].
Place marker, yarn needle.
 
GAUGE: 28 sts = 4"; 26 rounds = 4" in Rib, slightly stretched. CHECK YOUR GAUGE. Use any size needle to obtain the gauge.
 
Special Abbreviations
2/2 LPC = Slip next 2 sts to cable needle, hold to front; p2, k2 from cable needle.
2/2 RPC = Slip next 2 sts to cable needle, hold to back; k2, p2 from cable needle.
2/2 LC = slip next 2 sts to cable needle, hold to front; k2; k2 from cn.
2/2 RC = slip next 2 sts to cable needle, hold to back; k2; k2 from cn.
Ssk = Slip next 2 sts knitwise, one at a time to right needle; insert point of left needle into the fronts of these 2 sts and knit them together from this position.
Ssp = Slip next 2 sts knitwise, one at a time to right hand needle; pass them back to left hand needle and p2togtbl.
 
Note
Hat is worked in the round. As stitches are decreased and no longer fit on circular needle, divide them among 3 double pointed needles to complete.
 
K2, p2 Rib (worked over a multiple of 4 sts)
Round 1 (Right Side): * K2, p2; repeat from * around.
Repeat Round 1 for K2, p2 rib.
 
CAP
With smaller needles, cast on 100 (120) sts. Place marker for beginning of round and join, being careful not to twist sts. Work in K2, p2 rib for 1? (3?)".
 
Next Round (Inc): [(k2, p2) twice, k1, k into front and back of st, p1, p into front and back of st, (k2, p2) twice] 5 (6) times–110 (132) sts
Next Round: Work even in rib pattern as established, purl increased sts.
 
 
Setup Cable Pattern
Change to larger needles, begin with Round 1, work
Cable pattern from chart or instructions below:
Round 1: [K2, p2, k2, p2, 2/2 LPC, 2/2 RPC, p2, k2, p2]
5 (6) times.
Round 2 and all even-numbered rounds: K the knit sts and p the purl sts.
Round 3: [K2, p2, k2, p4, 2/2 LC, p4, k2, p2] 5 (6) times.
Round 5: [K2, p2, (2/2 LPC, 2/2 RPC) twice, p2] 5 (6) times.
Round 7: [K2, p4, 2/2 RC, p4, 2/2 RC, p4] 5 (6) times.
Round 9: [K2, p2, (2/2 RPC, 2/2 LPC) twice, p2] 5 (6) times.
Round 11: Repeat Round 3.
Round 13: Repeat Round 5.
Round 15: Repeat Round 7.
Round 17: Repeat Round 9.
Round 19: Repeat Round 3.
Rounds 20-22: K the knit sts and p the purl sts.
Round 23: Repeat Round 3.
Round 25: [K2, p2, k2, p2, 2/2 RPC, 2/2 LPC, p2, k2, p2] 5 (6) times.
Rounds 26-28: K the knit sts and p the purl sts.
 
Shape Crown
Round 1: [K2, (p2, k2) twice, ssp, p2tog, (k2, p2) twice] 5 (6) times–100 (120) sts.
Round 2 and even numbered rounds: K the knit sts and p the purl sts.
Round 3: [k2, p2tog, (k2, p2) 3 times, k2, p2tog] 5 (6) times. 90 (108) sts.
Round 5: [K2, p1, k2, p2tog, k2, p2, k2, p2tog, k2, p1] 5 (6) times–80 (96) sts.
Round 7: [K2, (p1, k2) twice, p2tog, (k2, p1) twice] 5 (6) times–75 (90) sts.
Round 9: [(K2, p1) twice, ssk, p1, k2tog, p1, k2, p1] 5 (6) times–65 (78) sts.
Round 11: [K2, p1, ssk, (p1, k1) twice, p1, k2tog, p1] 5 (6) times–55 (66) sts.
Round 13: [K2tog, p1, (k1, p1) 4 times)] 5 (6) times–50 (60) sts.
Round 15: [Ssk, k1, p1, ssk, k1, p1, ssk] 5 (6) times–35 (42) sts.
Round 16: [K2, k2tog, k1, k2tog] 5 (6) times– 25 (30) sts.
Round 17: [K2tog, k1, k2tog] 5 (6) times–15 (18) sts.
Round 18: K2tog around, k1 (0)–8 (9) sts.
 
FINISHING
Cut yarn leaving long tail. Thread tail through remaining sts and pull tightly to secure. Weave in yarn ends.
 

cable_chart2_1.gif


 
 
(4 Medium) STITCH NATION by Debbie Stoller? “Bamboo Ewe?” Art. T101 available in 3.5 oz (100 g); 177 yd (162 m) balls.
 
Abbreviations
K = knit; mm = millimeters; p = purl; st(s) = stitch(es); tbl = through back loop; tog = together; [ ] = work directions in brackets the number of times specified; * or ** = repeat whatever follows the * or ** as indicated.
 
  评论这张
 
阅读(479)| 评论(1)

历史上的今天

评论

<#--最新日志,群博日志--> <#--推荐日志--> <#--引用记录--> <#--博主推荐--> <#--随机阅读--> <#--首页推荐--> <#--历史上的今天--> <#--被推荐日志--> <#--上一篇,下一篇--> <#-- 热度 --> <#-- 网易新闻广告 --> <#--右边模块结构--> <#--评论模块结构--> <#--引用模块结构--> <#--博主发起的投票-->
 
 
 
 
 
 
 
 
 
 
 
 
 
 

页脚

网易公司版权所有 ©1997-2018